For questions or comments concerning these drawings please email us.
Water meter connection detail drawings.
Significant changes of note in 15th edition release july 11 2018.
Lanl standard drawings and details either 1 depict required format content or 2 are templates that are completed by a design agency lanl or external ae for a design drawing package in a manner similar to specifications.
8 or 1 meters 527 528 552 reclaimed water manual blow off reclaimed water master meter assembly 4 and larger reclaimed water details reclaimed meter box for 1 1 2 or 2 meter 505 type 1 reclaimed water sign 353 service connection on lined gravity sewer 195 concrete slab over shallow pipelines detail index revised 3 9 2012 water.
1 1 2 or 2 service connection.
They are intended to be used as a guide in the preparation and submittal of plans for private development and city contract projects within the city of raleigh and the city s extra territorial jurisdiction.
3 4 meter service connection.
Download thousands of free detailed design planning documents including 2d cad drawings 3d models bim files and three part specifications in one place.
Errata 1 notice of corrections march 11 2019.
Standard meter installation drawings single meter vault details 5 8 multiple meter service connection.
Errata 2 notice of corrections january 31 2020.
Standard water detail drawings w 25 water meter box detail w 26 standard gang meter assembly w 27 gang meter addressing single story building w 28 gang meter addressing multi story building w 29 typical 4 8 domestic water meter bypass installation w 30 typical 6 10 fire service domestic service w bypass.
15th edition errata 3 effective may 29 2020.
Std w 01 water service connection responsibility 1 std w 02 typical layout for watermains within developments 2 std w 03 customer connection and boundary box 25mm od pipe 4 std w 04 general pipe connections sheet 1 of 7 4 std w 05 general pipe connections sheet 2 of 7 3.
Wi 04 post meter constant pressure recycled water line 75mm 3 diameter or less crossing potable water main or lateral within public right of way 03 01 2001 wi 05 allowable leakage chart for testing of pipes with rubber joints 9 03 2001 wi 06 standard symbols for potable and recycled water construction drawings 11 03 2006 miscellaneous.
Engineering standards materials approval process jan.
Download complete engineering standards.
Errata 3 notice of corrections may 29 2020.
C ombination domestic fire service connection.
Dwg files are only available upon request.
The standard detail drawings below apply to all site permit review formerly concurrent review.